Product Details:
|
Other Name: | Road Pothole Repair | Suit For Weather: | All-weather |
---|---|---|---|
Environmental: | 100% Environmental Friendly | Packing: | 20 Kgs / Bag, 25 Kgs/ Bag |
Open The Traffic: | Fast Open The Traffic | Usage Time: | Permanent Repair |
Application: | Asphalt Pavement | Working Temperature:: | -25℃ To 50℃, Can Up To 90℃ For Extremely Hot Places |
High Light: | Permanent Cold Mix Asphalt,Cold Mix Asphalt Pothole Repair,asphalt emulsion crack filler in winter |
Permanent Road Pothole Repair Material Cold Mix Asphalt Material is patented high technology and environment friendly product, uses eco-friendly cold mix processing and significant ultra thin overlay technology, micro overlay cold asphalt especially designed for construction and maintenance of wearing courses. Its paving thickness only require 0.7-1.2cm. Construction is quick and easy.
Zhongtian pit repair technology meets the requirements of fast, timely and all-weather. With fast construction speed, easy operation and the advantages of construction in winter and rain and snow.
No. | Performance index | Technical requirements |
1 | Adhesive grade | 5 |
2 | Penetration strength (kg / cm2) | 0.5-4 |
3 | Stability (kN) | ≥3 |
4 | Residual stability (%) | ≥85 |
Advantages of Zhongtian Permanent Road Pothole Repair Material Cold Mix Asphalt Material;
1. Permanent pothole repair solutions;
2. Suitable for all weather and environment;
3. No mixing, tacking or mechanical compaction required;
4. Installation can be driven on immediately;
5. Green and environment-friendly;
6. Being prone to storage.
7.Good repairing quality.
8.Wide applicability.
9.High material utilization.
Construction steps
1 Pit cleaning
Clean up the gravel residue inside and around the pit to be repaired. No debris such as mud ice cubes can be left in the pit. Water in the pit does not affect the construction.
2 Brush interface agent
Brush the interface agent when necessary. For example: repair of cement pavement, repair of highway.
3 Fill the pit with cold fill
Fill enough pits into the pit (a 1m³ pit requires about 2.2 tons of cold fill) until the filler is about 1.5㎝ above the road surface. After filling, it’s better that the center of the pit is slightly higher than the surrounding road surface and is curved. If the pit depth is> 4㎝, the repair material should be filled and laminated layer by layer.
4 Compaction
After laying evenly, choose appropriate compaction tools and methods for compaction according to the size and depth of the repaired area and the actual environment. Such as car tire compaction, manual compaction, vibrating plate compaction compaction ad road compactor compaction. When repairing high-grade roads, the periphery and corners of the repaired area should be fully compacted. After the pits are compacted, the joints are closed with emulsified asphalt or joint tapes.
5 Open traffic
It can be opened to traffic immediately after compaction.
Zhongtian Permanent Road Pothole Repair Material Cold Mix Asphalt Material can be widely used in municipal roads, general roads, highways, parking lots, airport runways, tunnel damage of road asphalt concrete and cement concrete pavement, ruts, municipal road tunneling, repaired pavement, bridge expansion joints, heavy load pavement , repair and maintenance of road traffic and special road.
Contact Person: Shakiya
Tel: 86-15032577974
Fax: 0086-010-6789-3003